The King on the traverser 3008x2000 |
Number 6000 on the traverser 3008x2000 |
King on the traverser 3008x2000 |
The King after leaving the museum 3008x2000 |
Looking down on the King, the wickham can be seen just inside the doors 3008x2000 |
The King after being moved across for loading 3008x2000 |
Ready to be loaded 3008x2000 |
Separated from the tender 3008x2000 |
The Loco being loaded 3008x2000 |
The King passes its tender 3008x2000 |
'King George V' and its tender 3008x2000 |
The King being secured to the trailer 3008x2000 |
The King about to be partially dismantled 3008x2000 |
Cab roof being removed 3008x2000 |
Roof being placed on a separate lorry 3008x2000 |
Safety valve bonnet being removed 3008x2000 |
Chimney ready to be removed 3008x2000 |
Chimney after removal 3008x2000 |
King without its chimney, safety valve, safety valve bonnet and cab roof 3008x2000 |
6000 looking bare 3008x2000 |
The items had to be removed due to their height 3008x2000 |
Loaded and ready to go 3008x2000 |
Heading for the NRM 3008x2000 |
|